24 Mar
2025
24 Mar
'25
9:46 p.m.
On Mon, Mar 24, 2025 at 12:02 PM David Galloway <David.Galloway@ibm.com> wrote:
Buy new LRC gear, migrate what’s necessary, integrate old Sepia gear into “new” LRC
I don't think we necessarily need to keep the old sepia LRC nodes. As long as we migrate everything to new hardware it should be good. I think the LRC can just steal 3-6 nodes from the hardware we already plan to purchase (for the upstream lab). I think the troublesome part will be the RADOS replication to the new site. Will we have the VPN straddling the two sites at some point? -- Patrick Donnelly, Ph.D. He / Him / His Red Hat Partner Engineer IBM, Inc. GPG: 19F28A586F808C2402351B93C3301A3E258DD79D